Wednesday, August 25, 2010

Fall Projects

There is a still a lot of golf to be played this year and for the Grounds Department, there are still a lot of projects we want to have completed before the covers are placed on the greens. This year aeration is scheduled for the week of Labor Day. On Tuesday the 7th the course will be closed. We will begin the aeration process on Tuesday the 7th and it will continue throughout the week.

Aeration Schedule
Sept 7th-Deep tine aerate greens, roll, topdress and fertilize.
Begin solid tine aeration of Fairways
We will also be core aerating high poa populated areas on fairways and over-seeding these areas with creeping bentgrass
Sept 8th-Deep tine aerate approaches, roll and topdress
Sept 9th-Solid tine aerate tees, roll and topdress

If the weather cooperates and we have no major equipment issues we should be able to complete the entire aeration process by the end of the week.

6 Tee Stone and Timbers

The old timber edging, timber steps and Pillsbury stone along the 6th tee walk path will all be removed and replaced starting the week of September 20th. West Lake Landscape from Hopkins is the contractor who will be working on this project. This project is quite in depth and will take at least 4 weeks to complete. But once complete this will be the last of the timbers that need to be replaced on the course. Nine years ago we set out to have complete consistency with our landscape throughout the course. This is the last area on the course to have the timbers phased out and the lannen stone phased in.

Drainage

As we work toward increasing our creeping bentgrass population on the fairways we are working hard toward increasing surface drainage wherever we have areas where water stands following heavy rains or extended periods of rain. This past spring we added drainage to fairways 5, 9 and 13 as well as the approach on 16. The next area we will be working is the 18th fairway. First there is an old steel irrigation pipe that's very shallow and needs to be removed before any drainage can be installed. We have good bentgrass in this area of the fairway, but its difficult to maintain firm conditions during periods of extended wet weather, so adding drainage to this area will greatly improve the quality of this fairway area.

Bunker Repair and Maintenance
Due to the excessive temperatures we experienced this summer we have some areas on bunker edges and bunker faces that will require some additional attention. The second week in August we recorded greens surface temperatures reaching 130 degrees, soil temperatures close to 90 degrees. Plants don't function well in those conditions. Those were greens surface temperatures, I have no idea what the temperature was in the bunkers. Turf growing on bunker edges suffered, in some areas more than others and repair will be required.

We have struggled with the quality of the turf on the bunker faces on the left fairway bunker on 16 as well as the first fairway bunker on the right of 16. These are south facing bunkers and additional irrigation is needed. We will be pulling pop-up irrigation heads onto the shoulders. This will allow us to supplement these faces with additional irrigation as needed.

1 Tee Sod Job

The back right corner of the first tee receives a great deal of foot traffic throughout the season. No matter what the maintenance practices are it's difficult to maintain quality turf. On a given round there are typically four players and anywhere from 2-4 caddies that congregate in this area. Last week Rick Krause sodded this area. We will keep it roped off for a number of weeks until the sod has completely knitted and healed.

Following Labor Day we will begin working on these projects and do our best to have them all completed this fall and I'm sure there will be a lot more we can add to the list.

Wednesday, August 18, 2010

Dutch Elm Disease


Next Monday we will be removing the large American elm tree behind the 13th green. About 3 years ago this tree showed signs for Dutch elm disease. Since that time we have tried yearly fungicide treatments to protect the tree and in hopes that it would overcome this deadly disease. Unfortunately the tree has lost the battle and will need to be removed. Tim's Tree Service will be removing the tree Monday morning.

Going Organic?

Organic Golf Course Article

A very good article in the New York Times regarding the Vineyard Golf Club on Martha's Vineyard and their 100% organic approach to managing a golf course. I have often thought that managing a golf course organically could quite possibly be a due able concept. There would need to be some creativity on the Superintendents part and it would require some help from those in the organic farming industry to aid with the process, especially when it comes to insect control. In the process communication to golfers and dealing with loss of turf, especially in the early years would need to be tolerated. After a season like we endured this year with extremely high disease pressure, it would be interesting to see how that could be handled. I think its extremely important for us as Superintendents to think about the concept and go through the thought process as to what could be done to reduce our dependence on fungicides and insecticides. Changing our approach to how we manage with less fertilizer and less pesticides is not an easy proposition and yes at times it takes some GUTS. But change is never easy and going against what has been the norm for the past 30 years and traveling the road less traveled, some times you end up walking alone on the path.

This past 6 weeks, based on environmental conditions, has been one of the most difficult I can remember in my 20 years in the business. The heat, humidity and moisture produced by Mother Nature forced some extremely difficult disease pressure on us. The past 3 summers have been a cake walk compared to this summer. Summer patch, brown patch, dollar spot and pythium, diseases that at times were simultaneously active. I don't recall EVER seeing that in the past. Throughout the tough stretch of weather, yes we applied fungicides to protect our fine turf sward, but we have still reduced our overall dependence on fungicide as well as fertilizers in the past 3 years. In the past we were on a strict preventative fungicide regiment on greens, tees and fairways. Now we continue to treat greens regularly but tees and fairways are only treated on an as needed basis.

By treating only when required it forces us to be more diligent watching the extended weather forecast as well as our scouting for disease incidence on the course and then deciding if we need to make an application or will the weather change and the disease pressure changes and an application would not have been required. Sometimes the weather pattern dictates we spray, whether or not we have seen any fungal activity or not. The last 2 weeks were a good example of that. We knew night time temperatures were going to be in the 70's and daytime temps in the 90's with dewpoints in the 70's for an extended period of time. We treated greens, tees and fairways, knowing full well that pressure for brown patch was ideal. We also were required to spot treat fairways for pythium, multiple times.

Now with cooler nights and limited hot days we will monitor as the conditions dictate and will apply fungicides as we feel are required. But as the temperatures continue to decline and the humidity and dewpoints stay low we might very well be able to not make another fungicide application to tees and fairways until we begin to make our snow mold protection applications in the middle of October. Now wouldn't that be nice.

Tuesday, August 10, 2010

Wall Street Journal Article

This Wall Street Journal Article does a great job explaining the stressful summer it has been throughout the country and what golf courses have been dealing with. Thankfully we have not endured these types of conditions in our area(or at least not to this degree), but the past two weeks have been the worst weather conditions in the Minneapolis area regarding heat and continual humidity we have experienced in a long long time. Disease pressure has been off the charts. We have experienced brown patch, pythium blight, dollar spot and summer patch all at the same time. Other courses in the area are also dealing with these issues as well as anthracnose, another potentially destructive disease.

The weather forecasters are predicting the weather to break after this week. Lets hope their forecast holds up or the weather breaks sooner.

How Turf Dies in the Summer

Click here to see how turf dies in the summer

Every want to know how turf dies in the summer? Here is an excellent 6 minute video explaining how.

Wednesday, July 28, 2010

Bald Eagles have success!

If you've followed the blog throughout this season you will have read a few posts about wildlife on the grounds of Minikahda, here's our proudest update. About 15 years ago our local tree company built an Osprey platform in one of the tall Cottonwood trees on the east side of hole #7. After having no success with anything nesting on the platform, the effort became all worth wild this year, as a pair of Bald Eagles chose to call it home. With many of us grounds crew guys and members watching the pair all season the intrigue and wonder; it was in our minds if the pair would have any successful offspring. Today was the proud and happy day that brought the answer to that question. While doing some morning maintenance some crew members spotted something on the ground by the tees on #7, it was one of the adult Bald Eagles standing next to it's offspring! Success! Our hopes had come true, the nesting pair of Eagles just two miles from downtown Minneapolis had raised a young one. Below is a couple pictures of 'Junior' checking out the fairway bunker on #7.






Thursday, July 22, 2010

Bathrooms Updated

Along with the restoration work in 2002-03 we rebuilt the on course bathrooms. At the time the updates were great and at the time we had decided to use a toilet that would compost the waste, called a Biolet. Unfortunately the toilets were not designed for the high use we have on the golf course. Last year the decision was made to install septic tanks which we are able to pump empty when needed.

This week Kothrade Sewer, from Hanover, MN, installed two 1000 gallon septic tanks and installed new toilets as well. A 10 inch diameter vent stack was added with a roof fan that will create positive air flow and keep any smells to a minimum. The new set-up should be a win-win. The golfers will have a better environment for a pit stop and our staff will no long have to put themselves in close contact to the waste like they did when they had to empty the Biolet toilets. In order to keep the septic tanks cleaned yearly we will bring in Biffs Company to extract the waste and carry it off site.


There is still a little bit of work that needs to be completed, like epoxy the floors, repainting the walls and painting of the vent stack, otherwise the bathrooms are fully functional and ready for use.

Friday, July 16, 2010

Invitational Photos

A nice touch to the beginning of the event. A nice Scottish flair for this old Donald Ross course.
First Assistant Nick Folk setting the tournament hole locations.
Assistant Johnny Jarosz, 27 years at Minikahda and nobody can mow a straighter fairway center cut line than Johnny and I mean nobody.

See what I mean? No lines painted, no GPS necessary, all you need is Johnny with his built in radar.

Thursday, July 15, 2010

Conversion Progress Update

So we have been working on converting our greens from their former predominantly poa annua stand to a sward of creeping bentgrass. Beginning in the spring of 2009 we began implementing our change in philosophy and management practices from favoring the poa to favoring the bent. Here are a few photos to show the progressing.

#2 green, April of 2009

#2 green, July 2010

#14 Green, April 2009
#14 Green, July 2010

We have be working with Greenway Golf throughout the process. Does our new management approach work? I think the photos speak for themselves.

Monday, July 5, 2010

The Reason Behind the Madness


Many members might be wondering why are we trying so hard to convert our greens from a stand of poa annua to creeping bentgrass? They say a photo is worth a thousand words, well this photo should pretty much explain it all. The plug on the left is a sample of the creeping bentgrass and the root system associated with it on our tees. The next plug to the right is a sample of the creeping bentgrass roots on the 15th green. The third sample is a combination of creeping bentgrass and poa annua and the last sample on the right is what our current poa annua root system looks like.

In a typical summer the poa roots might not be as short as they our now, due to the fact that all of our cultural maintenance practices would revolve around promoting poa and the poa root system. Currently that is not that case and we are doing all we can to promote creeping bentgrass while striking a balance at growing poa and not losing the density of the plants. We still need to grow grass and provide a playing surface.

Our current scale is tipping a little bit too much towards the bent and we need to bring that back in balance so we don't end up compromising the health and condition of the poa. This is where the art of greenkeeping takes place. It's a fine line to walk some days and as we head into the stressful part of the summer we need to watch things that much more carefully.

Monday, June 14, 2010

Drainage Project 9th Fairway



Standing water previous to drainage project.
200 ft of drainage tile
Rick (the master) showing the young student (Joey) not only how to do the job right but do it quickly. Anyone want to explain to me why soils like this need fertilizer?
The finished product.


Another drainage project was completed this morning, this time in the middle of the 9th fairway. In this location, about 175 yards from the green, is a location following heavy rains we would have water standing in about 6 spots. In order for us to maintain firm and dry playing conditions its important to make sure all surface water is removed as quickly as possible. This is one area where water coming down from the upper half of the 9th hole as well as water coming across from the 10th fairways settles.

2nd Assistant, Rick Krause and intern Joey Scheffler installed 200ft of drain tile and created 6 inlet holes for the water to access. The tile was tied into an existing line further back in the fairway. The existing tile extends into the lowest area in the right rough on 9.

Rick and Joey along with some assistance from other staff members were able to complete the project this Monday in about 5 hours. They did a great job and in a couple of days the sod will have mended and most people will never know they even did any work in the area.

Latest Course Condition Report

The month of June has proved to be an extremely wet month for us.  Until today we have held our own quite well.  We are blessed with a cou...